GREYFUSION
← Portfolio

Zenith Agro 2.4MW Hybrid Micro-Grid

A 2.4MWp solar array with 4.8MWh of storage and synchronised 1.5MVA generator backup powering a rice-processing complex — 99.2% uptime since commissioning.

The engineering challenge

Milling loads spike 6× in under a second when hullers engage, which collapses conventional inverter-led grids. Diesel gensets ran 22 hours daily at ₦38M monthly, and the 33kV feeder averaged eleven outages a week.

How we solved it

Our energy division specified grid-forming inverters with 2C-rated battery strings to absorb motor inrush, while the construction division delivered the substation and cable trenching as one contract. Generator runtime fell to 90 minutes a day; the plant's energy cost per tonne of rice dropped 63%.

Planning something comparable?

Our estimating desk responds within two working days.

Request a Capability Deck