When we instrument a site for two weeks — actual load curves, not nameplate guesses — the honest cost of power almost always surprises the board.
The four lines your logbook skips
Maintenance, depreciation, the overhaul cliff and downtime — priced together, they push the true cost of diesel power far above the grid, and far above a properly sized hybrid system.
None of this requires believing anything about the climate. It requires believing your own meter data.
Sizing from telemetry, not thumb rules
Motor inrush collapses inverter-led grids; grid-forming inverters with 2C-rated strings absorb it. The design input is measured load, not a catalogue.
A system guaranteed in the contract is worth more than one promised in the brochure.
What it means for your next decision
Read against the Energy Transition Plan, the practical takeaway is simple: the operators who win here are the ones who measure 63% lower energy cost per tonne before they commit capital, not after. Greyfusion publishes the assumptions behind these numbers because confident analysis survives scrutiny.
If this maps to something you're planning, the Energy desk answers with a working model, not a brochure — talk to us before the decision, not after.